Process
of Manufacture :
CRCA Sheet/Coils are received in press shop where de-coiling and
sheet leveling are done.After
sheet leveling sheets are cut to require sizes. The cut size sheets
are transferred to the power press and notching operation is carried
out. After notching operation
sheets are transferred to CNC press brakes for doing necessary
bending.
Components which are received from
press shop are transferred to assembly department for doing spot
welding, Co2 welding, ARC welding, Grinding etc.
Assembled components are transfer
to pre-treatment plant for treating in 7 tank for degrees, zinc,
phosphating and passivation.
Material received from pre-treatment
department are immediately powder coated in the dust free painting
booth and then the articles are put inside a baking oven at a
temperature of 180°C for about 20 minutes.
Then the painted items are sent to
the fitting department for necessary fitment of necessary accessories
and afterwards final inspection is carried out before packing
the goods.
|